KİPAŞ DENİM INC.

Is used to trade on from  the bulk energy of cogeneration station with a capacity of 20 Mw.

 

KAHRAMANMARAŞ PAPER INC.

Pre-insulated pipes were installed in the green house  which is built on a 4000 square kilometer land.

 

GENDARME BULWARK GROUP COMMANDERS

Pre-insulated pipes were installed in all underground pipings of heating centers in various premises in Güvercinlik / ANKARA Eşref Bitlis Barracks.  

 

BSH PROFILO APARTMENTS

Pre-insulated pipes were installed in the building of the apartments for BSH management staff in Çerkezköy.

 

 

ÇERKEZKÖY ENERGY ELECTRICITY PRODUCTION INC.

The pipes in ÇERKEZKÖY O.S.B. borders carrying pressurized steam at 12 Bar will directly be burried into the ground.  And these Industrial Type  pre-insulated pipes distributes the 62 ton/hour steam to various clothing factories in the Organized Industry Region.

 

SÖNMEZ ELECTRICITY PRODUCTION

The pipes in UŞAK KARMA O.S.B borders carrying 86 tons/ hour  of pressurized steam from 17,4 MW cogeneration power plant at 10 Bar and  184 C0 will directly be burried into the ground.  And these Industrial Type  pre-insulated pipes distributes the 62 ton/hour steam to various clothing factories in the Organized Industry Region.

 

 

   

BILKENT UNIVERSITY

In the mechanical pipings of the campus, pre-insulated pipes were installed without any concrete protection.

   

 